The Transit Coalition
« Post Message »

Welcome Guest. Please Login or Register.
May 25, 2013, 12:10am




The Transit Coalition :: Rail Transit :: Valley-Westside Rail Tunnel :: Post Message
Post Reply
Name:
Subject:
Terms of Service: I agree to the ProBoards Terms of Service
Security Check:
Message Icon: icon
Add Tags:
Add Smilies:
Message:
Expand
Characters Remaining:
Disable Smilies: If this box is checked, smiley emoticons will be disabled in your message.
shortcuts: hit alt+s to send, alt+p to preview, alt+c to spell check, or alt+r to reset


Topic Summary
Posted by tonyw79sfv on Feb 7, 2012, 9:33pm
Something just crossed my mind here. The Orange Line has a 2015 deadline to repay the State of California $44 million (from Proposition 108) if it doesn't get converted to rail. In the event that doesn't get waived and Metro does end up paying, is it going to come out of that $180 million surplus gained from the Orange Line extension savings?
Posted by masonite on Feb 7, 2012, 9:46pm
I am pretty sure it is only $45M under budget. The $180M is the amount of the project, not the amount under budget. $225M was the project budget.
Posted by tobias087 on Feb 8, 2012, 1:03am
In my opinion, if this project has to be split into phases, it makes much more sense to start in the southern, more densely populated, area of the Valley. Especially since that's where the 405 line will go. It would be unfortunate if there were two rail lines, a West LA to Orange line and a North Valley line, with a several mile gap in between.
Posted by regen on Feb 8, 2012, 9:44pm
The densest area around Van Nuys Boulevard is from Nordhoff to the Orange Line. That said, any potential phasing within the Valley would depend in part on engineering issues, which Metro will have to study.
Posted by matthewb on Feb 9, 2012, 5:26am

Feb 8, 2012, 9:44pm, regen wrote:
The densest area around Van Nuys Boulevard is from Nordhoff to the Orange Line. That said, any potential phasing within the Valley would depend in part on engineering issues, which Metro will have to study.


Right, if we follow the street grid approximately (no diagonal tunneling), it's about 2.8 miles from Van Nuys and the Orange line to Sepulveda and Ventura (approximately where one might meet some form of transit coming along the 405). That's more than a rounding error in terms of the cost of building a rail line. In all likelihood, though, I imagine Metro will likely choose bus over rail for both segments. In that case, the 405 line might be extended north to around Burbank or Oxnard, and it would have to be fought out whether there would be through service from the 405 corridor to Van Nuys Blvd.

I of course would much prefer rail, but that would depend on Measure R++ being proposed, passing, and prioritizing a combined rail project on these corridors (they're considered to be two projects, and as a result are effectively two political bargaining chips). There are a lot of open hands in LA county, and while I think this is one of the more deserving projects, there will be a lot of politics involved.
Posted by Dan Wentzel on Feb 9, 2012, 9:34am
That Metro is probably preparing to dump two disconnected bus projects in this area is a tragedy.
Posted by bzcat on Feb 9, 2012, 11:00am

Feb 9, 2012, 9:34am, Dan Wentzel wrote:
That Metro is probably preparing to dump two disconnected bus projects in this area is a tragedy.


But a tragedy we saw coming.

I first raised the issue 2 years ago (the reason I signed up for this board) because I found it incomprehensible that Metro would do 2 independent corridor studies and ignore the other parts in each study. The only way this becomes a rail project is if they are combined. Metro's methodology greatly favors existing mode of transit, so anything that will connect with Orange line will favor bus. And in all honesty, if you only consider transit improvements within the Valley, BRT makes a lot of sense. But that is the flaw in Metro's limited scope study... what makes sense within SFV, doesn't make much sense when taken into account future extensions and transit beyond SFV.
Posted by tobias087 on Feb 9, 2012, 5:16pm
Before we jump to conclusions about what Metro is or isn't planning, I think we should try to keep something in mind that we often overlook on this board, and elsewhere: the staff people who work at Metro are actual human beings, not study-generating machines.

In my experience, at least over the last 2 years I've been paying attention to this stuff, regardless of what happens on the political/economic end, or with the Metro board, the reports prepared by staff typically represent an extremely reasonable viewpoint on the issues.

And considering how obvious it is that this should be a rail corridor (and that I'm sure at least some of the staff reads this board, or Streetsblog etc., where we talk non-stop about why it's so obvious), I really doubt that the rail alternative is going to be just *overlooked* because of the faulty wording in the study initiation.
Posted by masonite on Feb 9, 2012, 6:10pm

Feb 9, 2012, 5:16pm, tobias087 wrote:
Before we jump to conclusions about what Metro is or isn't planning, I think we should try to keep something in mind that we often overlook on this board, and elsewhere: the staff people who work at Metro are actual human beings, not study-generating machines.

In my experience, at least over the last 2 years I've been paying attention to this stuff, regardless of what happens on the political/economic end, or with the Metro board, the reports prepared by staff typically represent an extremely reasonable viewpoint on the issues.

And considering how obvious it is that this should be a rail corridor (and that I'm sure at least some of the staff reads this board, or Streetsblog etc., where we talk non-stop about why it's so obvious), I really doubt that the rail alternative is going to be just *overlooked* because of the faulty wording in the study initiation.


I agree. The major issue as to why this may not be rail is first and foremost money. Right now, there isn't money to build a rail line from Sylmar to Expo. That is the major obstacle. People are delusion if they think the savings from the Orange Line is going to get this done.
Posted by matthewb on Feb 10, 2012, 2:38am

Feb 9, 2012, 6:10pm, masonite wrote:
I agree. The major issue as to why this may not be rail is first and foremost money. Right now, there isn't money to build a rail line from Sylmar to Expo. That is the major obstacle. People are delusion if they think the savings from the Orange Line is going to get this done.


I never thought that Metro wouldn't provide rail because they were incompetent, but because of money. Sylmar to Expo would be great, of course, but I think that if an initial segment could be built from the Orange line to the Purple line at Westwood, that would have enormous impact, and might be able to get funding. That would be my vote, with future extensions north and south. Once you have that connection, any future extension in either direction benefits both the valley and the westside, especially connections south to Expo and LAX. I imagine a reasonable chance at that point that the valley could coalesce, much like communities along the Gold line foothill extension, to push for northward extensions along Van Nuys Blvd towards Sylmar.
Posted by tonyw79sfv on Apr 2, 2012, 8:50pm
http://thesource.metro.net/2012/04/02/me....nsit-corridor/

Looks like Metro is starting another round of meetings, this time broadening the scope beyond just Van Nuys Boulevard to include Sepulveda Boulevard (San Fernando Valley segment) and routing to the Sylmar/San Fernando Metrolink station; however there's no mention of tying this with the Sepulveda Pass corridor project as a single continous line. The same alternatives are presented. Please try to attend these upcoming meetings, all from 6pm to 8pm.

Thursday, April 12, 2012, City of San Fernando Regional Pool Facility, Aquatic Center Multipurpose Room, 201 Park Avenue, San Fernando. *Accessible via Metro Local 94, 224 (1 block); 234 (2 blocks); Metro Rapid 734, 794 (3 blocks). Note the Sylmar San Fernando Metrolink station is a mile away with connections to Metro Local 230, 292 (there are other local lines that don't run late).

Tuesday, April 17, 2012, Cathedral of St. Mary Byzantine Catholic Church Auditorium, 5329 Sepulveda Boulevard, Sherman Oaks. *Accessible via Metro Local 234 (1 block), Metro Local 183 and Metro Rapid 734 (2 blocks); the Metro Orange Line Sepulveda station is a mile away.

Wednesday, April 18, 2012, Valley Presbyterian Hospital Auditorium, Jean & David Fleming Health Education Center, 15107 Vanowen Street, Van Nuys. *Accessible via Metro Local 234, 165 and Metro Rapid 734 (1 block); the Metro Orange Line Sepulveda station is a mile away.

Metro also changed the project's URL to http://www.metro.net/EastSFVTransit which at this moment encounters a 404 error.
Posted by tonyw79sfv on Apr 4, 2012, 1:36pm
http://www.metro.net/board/Items/2012/04_April/20120404OtherSectorSFVItem6.pdf

Project manager Walt Davis will be giving an update around 6:30pm tonight at the Metro San Fernando Valley Service Council in the Marvin Braude Constituent Service Center (6262 Van Nuys Blvd.
Van Nuys, CA 91401 located 3 blocks north of the Van Nuys Orange Line station). The project's name has been changed to the "East San Fernando Valley Transit Corridor". The attached document shows additional routings on Sepulveda Boulevard, northern San Fernando Road, and even the Orange Line between the Sepulveda and Van Nuys stations as part of the alternatives.
Posted by matthewb on Apr 11, 2012, 1:38am
Curbed has an article on the addition of Sepulveda to the Van Nuys study: http://la.curbed.com/archives/2012/04/me....n_sepulveda.php
Posted by thanks4goingmetro on Apr 12, 2012, 1:25pm
Metro's Projects page calls the East SFV and 405 Transit Corridor projects 'bus corridors.' I wonder how much of a cost saving they are expecting by using buses that will run on the same mountain pass as 300,000+ cars without opening it up again to add yet more lanes to the tune of over $1 billion.

Seems like at some point common sense will prevail when adding bus lanes and building a tunnel will cost around the same when involving the pass.

Metro will inch closer to this realization along with that the two projects are really and truly one. I'd rather see this project stalled until a tunnel for rail operations can be afforded than a half-ass or worse yet billion dollar busway from the valley through the pass...
Posted by macross287 on Apr 12, 2012, 7:14pm
I just got back from the first community meeting of the expanded East SFV Transit Corridor

1. Metro engineers are not fond of the idea of connecting this corridor to the Sylmar Metrolink Station since they have been prohibited from using the Antelope Valley ROW, because of High Speed Rail and the planned bike way along the corridor, and San Fernando Road is not wide enough to support anything other than mixed flow BRT.

2. I believe one of the engineers told me that Sepulveda/Ventura is much more congested than Van Nuys/Ventura which makes any infrastructure at that intersection less palatable. This gives me hope that possibility of linking this projected to carpool lanes is out of the question.

3. Sometime this Summer Metro will be holding another round of meetings with possible Hybrid routes for this corridor aside from the All Van Nuys or All Sepulveda options.

Posted by tonyw79sfv on Apr 12, 2012, 8:30pm

Apr 12, 2012, 7:14pm, macross287 wrote:
I just got back from the first community meeting of the expanded East SFV Transit Corridor

1. Metro engineers are not fond of the idea of connecting this corridor to the Sylmar Metrolink Station since they have been prohibited from using the Antelope Valley ROW, because of High Speed Rail and the planned bike way along the corridor, and San Fernando Road is not wide enough to support anything other than mixed flow BRT.

2. I believe one of the engineers told me that Sepulveda/Ventura is much more congested than Van Nuys/Ventura which makes any infrastructure at that intersection less palatable. This gives me hope that possibility of linking this projected to carpool lanes is out of the question.

3. Sometime this Summer Metro will be holding another round of meetings with possible Hybrid routes for this corridor aside from the All Van Nuys or All Sepulveda options.



(Note to moderator if thread title needs to be changed due to the expanded scope on the East SFV project or merged with the Valley-Westside rail thread.)

I was also at the meeting in San Fernando. They had a presentation slide that finally mentioned from public comment regarding connecting this project with the yet-to-be studied Sepulveda Pass transit corridor. Regarding the hybrid option where both Sepulveda Blvd and Van Nuys Blvd would be used (but not in parallel), the changeover could happen at any intermediate street, including Parthenia Street, even though the project map only shows the Orange Line ROW being the changeover route. I was glancing over the aerial maps where the public is invited to write their ideas in addition to the writing pads on easels, public thoughts written were: that bicycles need to be included in the study, continuous rail from Sylmar to Westwood was mentioned, however, as I expected from the Sepulveda/Brand Blvd alignment, someone or some people wrote about opposing running anything on Brand Blvd (in Mission Hills). Mission Hills, unlike North Hills, Pacoima, Panorama City, and Van Nuys has a different demographic, which also holds true in the fact that Metro Rapid 734 doesn't have a stop between Sepulveda/Devonshire and Brand/Laurel Canyon (a 2 mile gap), skipping the very area where opposition was voiced.

I forgot to mention that a fourth meeting has been scheduled in addition to the three already announced:

Tuesday, May 1, 2012, 6-8pm
Mission Community Police Station
11121 N. Sepulveda Bl
Mission Hills, CA 91345
Served by Metro Local Lines 239 and 234
Posted by Philip on Apr 16, 2012, 12:09am

Apr 12, 2012, 7:14pm, macross287 wrote:
1. Metro engineers are not fond of the idea of connecting this corridor to the Sylmar Metrolink Station since they have been prohibited from using the Antelope Valley ROW, because of High Speed Rail and the planned bike way along the corridor, and San Fernando Road is not wide enough to support anything other than mixed flow BRT.


I'm actually glad this is the case. Yes, it lowers the scope of the initial phase of the project, but it also allows for 1) service along Van Nuys to Foothill Blvd., which is still needed and 2) a future extension of the Red Line to Sylmar (where it belongs).

As nice as it sounds, I think a full line from Sylmar to Expo really was wishful thinking; in my opinion, we should re-focus our efforts on 1) making sure the Sepulveda pass corridor is rail that connects from the Orange Line at Van Nuys to the Purple Line at Westwood Blvd. and 2) getting TSM for Van Nuys Blvd., keeping the corridor open for further expansion of the Sepulveda Pass project.
Posted by tonyw79sfv on May 17, 2012, 6:25am
From agenda item 13 yesterday afternoon at the Planning and Programming Committee Meeting in the Metro Board Room:

RECEIVE AND FILE the following on the East San Fernando Valley
North-South Rapidways
: [HANDOUT]

A. The Final Report on the Reseda, Sepulveda and Lankershim/San
Fernando Rapidway Corridors; and

B. Status Report on the Van Nuys/Sepulveda Transit Corridor
Alternatives Analysis.

Note: Comment period closes tomorrow. They are continuing work on the alternative analyses. Another round of community meetings are scheduled late this summer. This will go to the Fall/Winter Metro Board.
Posted by matthewb on May 17, 2012, 2:58pm
Well, the report claims that not much more can be squeezed out of buses on this corridor and any "improvements" would be a waste of money. I hope this means they can start focusing on rail on Van Nuys as a northward extension of a Sepulveda Pass rail line that stops at UCLA and Wilshire/Westwood.
Posted by matthewb on Sept 19, 2012, 12:02am
Public meetings scheduled for October:
http://thesource.metro.net/2012/09/18/in....corridor-study/
Posted by Dan Wentzel on Sept 19, 2012, 11:36am

Apr 16, 2012, 12:09am, Philip wrote:

Apr 12, 2012, 7:14pm, macross287 wrote:
1. Metro engineers are not fond of the idea of connecting this corridor to the Sylmar Metrolink Station since they have been prohibited from using the Antelope Valley ROW, because of High Speed Rail and the planned bike way along the corridor, and San Fernando Road is not wide enough to support anything other than mixed flow BRT.


I'm actually glad this is the case. Yes, it lowers the scope of the initial phase of the project, but it also allows for 1) service along Van Nuys to Foothill Blvd., which is still needed and 2) a future extension of the Red Line to Sylmar (where it belongs).

As nice as it sounds, I think a full line from Sylmar to Expo really was wishful thinking; in my opinion, we should re-focus our efforts on 1) making sure the Sepulveda pass corridor is rail that connects from the Orange Line at Van Nuys to the Purple Line at Westwood Blvd. and 2) getting TSM for Van Nuys Blvd., keeping the corridor open for further expansion of the Sepulveda Pass project.


Instead of getting to Sylmar in one swoop, I'd try for Van Nuys Metrolink if we can.
Posted by tonyw79sfv on Sept 20, 2012, 1:03am

Sept 19, 2012, 11:36am, Dan Wentzel wrote:

Apr 16, 2012, 12:09am, Philip wrote:


I'm actually glad this is the case. Yes, it lowers the scope of the initial phase of the project, but it also allows for 1) service along Van Nuys to Foothill Blvd., which is still needed and 2) a future extension of the Red Line to Sylmar (where it belongs).

As nice as it sounds, I think a full line from Sylmar to Expo really was wishful thinking; in my opinion, we should re-focus our efforts on 1) making sure the Sepulveda pass corridor is rail that connects from the Orange Line at Van Nuys to the Purple Line at Westwood Blvd. and 2) getting TSM for Van Nuys Blvd., keeping the corridor open for further expansion of the Sepulveda Pass project.


Instead of getting to Sylmar in one swoop, I'd try for Van Nuys Metrolink if we can.


As a daily rider of the 233 & 761, I find Van Nuys/Nordhoff to be a better preliminary northern terminus as that is where a large part of Van Nuys Boulevard's ridership starts and ends; the Van Nuys Metrolink/Amtrak station actually sees little transfer activity between the 169/233/761 buses and Metrolink/Amtrak trains; way less than buses at major intersections between Nordhoff Street south to the Orange Line.

BTW, here's info on the upcoming meetings:


> Tuesday, Oct. 2, 2012, 6-8 p.m. at the Sepulveda Middle School, 15330 Plummer St. in North Hills, CA 91343. This location is served by Metro Rapid Line 734 and Metro Local Lines 234 and 167.

> Thursday, Oct. 4, 2012, 6-8 p.m. at the San Fernando High School, 11133 O’Melveny Av in San Fernando, CA 91340. This location is served by Metro Rapid Lines 734 and 761 (local line 230 stops in front of this school, 234 stops close at Laurel Canyon and Brand).

> Saturday, Oct. 6, 2012, 10 a.m.-12 p.m. at the Panorama High School, 8015 Van Nuys Blvd. in Panorama City, CA 91402. This location is served by Metro Rapid Line 761 and Metro Local Lines 169, 233 and 656;DASH Route- Panorama City/Van Nuys.

> Tuesday, Oct. 9, 2012, 3-5 p.m. at the Marvin Braude Constituent Service Center, 6262 Van Nuys Blvd., Van Nuys, CA 91401. This location is served by Metro Orange Line, Metro Local Lines 154, 156, 164, 233 and 237 and Metro Rapid Line 761; DASH Panorama City/Van Nuys and Van Nuys/Studio City.
Posted by matthewb on Sept 20, 2012, 6:50am

Sept 20, 2012, 1:03am, tonyw79sfv wrote:
As a daily rider of the 233 & 761, I find Van Nuys/Nordhoff to be a better preliminary northern terminus as that is where a large part of Van Nuys Boulevard's ridership starts and ends; the Van Nuys Metrolink/Amtrak station actually sees little transfer activity between the 169/233/761 buses and Metrolink/Amtrak trains; way less than buses at major intersections between Nordhoff Street south to the Orange Line.


That's a reasonable point. One thing to consider, though, is whether additional ridership isn't present because there aren't currently better connections through to Westwood. The idea is that it might not make sense to have rail anywhere on Van Nuys if we consider it in isolation, but that having it be part of a Sepulveda Pass rail project would generate new ridership across the entire region.
Posted by Dan Wentzel on Sept 20, 2012, 9:17am

Sept 20, 2012, 6:50am, matthewb wrote:

Sept 20, 2012, 1:03am, tonyw79sfv wrote:
As a daily rider of the 233 & 761, I find Van Nuys/Nordhoff to be a better preliminary northern terminus as that is where a large part of Van Nuys Boulevard's ridership starts and ends; the Van Nuys Metrolink/Amtrak station actually sees little transfer activity between the 169/233/761 buses and Metrolink/Amtrak trains; way less than buses at major intersections between Nordhoff Street south to the Orange Line.


That's a reasonable point. One thing to consider, though, is whether additional ridership isn't present because there aren't currently better connections through to Westwood. The idea is that it might not make sense to have rail anywhere on Van Nuys if we consider it in isolation, but that having it be part of a Sepulveda Pass rail project would generate new ridership across the entire region.


That's my thinking. I see Metrolink riders as more likely to be willing to transfer from rail to rail, than from rail to busway.
Posted by bzcat on Jan 14, 2013, 2:54pm
Alternative analysis for the EIR is out...

Only 1 LRT option remain vs. 3 BRT so I think the fix is in for buses.

The good news is that all the BRT options remaining are median running instead of curb side running, which means the resulting BRT should be pretty high quality. It will also make the eventual upgrading to LRT easier to accomplish.

The bad news is only 1 BRT option has a feasible connection point to Sepulveda Pass project (option 3) near Ventura Blvd. Conceivably, Metro could end the BRT well short of the Sepulveda Pass project and the two will not meet.


http://thesource.metro.net/2013/01/14/al....-further-study/

[image]

Edit: for the lazy, here is the summary

LRT option: Sylmar Metrolink Station to Ventura Blvd via Van Nuys Blvd - highest boarding potential and most community support

BRT option1: Sylmar Metrolink Station to Orange Line Van Nuys Station via Van Nuys Blvd. Buses will run in mixed traffic (!!!) to Ventura Blvd - this is a pretty terrible option.
BRT option2: Sylmar Metrolink Station to Orange Line Sepulveda Station via Van Nuys Blvd and Orange line - not much different than option 1 other than that buses will crowd onto the Orange line for 1 mile between Van Nuys and Sepulveda.
BRT Option 3: Sylmar Metrolink Station to Ventura Blvd via Van Nuys Blvd, Orange Line, and Sepulveda Blvd - the best of the BRT option as it provides for dedicated bus lane all the way to Ventura Blvd with possible direct connection to the Sepulveda Pass project.

Click Here To Make This Board Ad-Free


This Board Hosted For FREE By ProBoards
Get Your Own Free Message Boards & Free Forums!
Terms of Service | Privacy Policy | Notice | FTC Disclosure | Report Abuse | Mobile